Cut the various hoses for the intercooler connection and started to test fit to the engine. It looks like some more adjustments will be needed before final placement with the cowling on, but have a good starting point. Installed the solenoid valve on the firewall and began looking at how to secure the lines. One of the three rivnuts in the firewall started to spin with the bolt half way in, so will need to deal with that once I remove the topskin. The instructions are silent on many of the intercooler steps so requires looking at several pictures and interpreting.